Customize Consent Preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorized as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site. ... 

Always Active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.

No cookies to display.

Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.

Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.

No cookies to display.

Advertisement cookies are used to provide visitors with customized advertisements based on the pages you visited previously and to analyze the effectiveness of the ad campaigns.

No cookies to display.

Case Study

Manufacturing | Afrox Linde | Sasolburg 6.6kV Substation Motor Terminations

Online condition monitoring provides information on the reliability of the terminations. Conducting investigations and corrective measures after high level findings will ensure a running and reliable power plant. This will prevent premature failures and unplanned power outages.
Download

Client Background

The client provides engineering services and a focused range of performance enhancing atmospheric gases, welding and safety products and LPG to valued customers. Given the criticality of the services offered by the client, MV components in all electrical networks must be kept to a highly reliable and maintainable standard to prevent premature failure.

Should the client experience downtime of this critical electrical plant, the result would be a loss of production and severe repair or replacement costs.

As a result, Martec conducted an online assessment using the Partial Discharge Frequency System Analyzer (PDFSA) technology to ascertain the condition of the MV components in 6.6kV substation in Sasolburg. High PD activity was detected in the frequency range of the terminations (112 to 200MHz).

Key Challenges

Over bending of termination leads, this will create voids under the anti-tracking tube and result to partial discharge and ultimately, a complete failure.

Water ingress to the terminal boxes. Termination leads exposed to water while energised are susceptible to a water treeing phenomenon in which tree like micro voids are formed in the insulation.

Martec Intervention

Martec conducted a visual inspection of the motor terminations due to the high PD activity detected during the on line assessment. The inspection revealed deviations from required MV installation standards. Corrective actions were administered by Martec to prevent zorc leads from touching the metal casing. Physical damage and overbending of termination leads could not be rectified during the inspection. It was strongly recommended that the terminations be periodic trended until re installed under quality assurance processes.

Value add

  • The cost effective PDFSA technology can identify defects before they turn into failure.
  • The PDFSA system is a complete analysis system. The process employs patented data acquisition equipment and analysis techniques that provide much more information than simply the existence, the absence or the magnitude of partial discharges.
  • An online condition assessment complements a proactive maintenance tactic.
  • High PD signals detected during on line condition assessment prompted further investigation by visual inspection.
  • Findings from the inspection were used to assess the condition of the terminations to enable selective intervention prior to complete failure.

PDFSA Signals

 

Frequency Domain
Frequency Domain
128MHz - Terminal Box Area
128MHz – Terminal Box Area

Tools and Technology

  • Partial Discharge Frequency System Analyser (PDFSA)
  • Ultra Sound Scanning
  • Visual Inspections
  • Investigations